From specification to install

How it works

A single, accountable process. A typical residential project runs 12–20 weeks from approved specification to completed installation.

A furnished residential living room
01

Specification review

You send your design package — floor plans, elevations, moodboards, FF&E schedules. We review every item and flag discontinued models, unrealistic lead times, budget mismatches or products that do not ship to your destination. 3–5 working days.

3–5 working days

02

Selection & alternatives

For every specified item we confirm availability, current pricing and lead time. Where a product is discontinued or over budget, we propose alternatives. Nothing is substituted without your approval.

1 week

03

Quotation

One quote covering all items, grouped by room or category. It includes factory price, trade discount (30–50% off retail), our procurement fee and a consolidated total. Freight and customs are shown separately at cost — not included in the furniture price. No hidden charges.

2–3 days

04

Order & production

50% deposit, then we place orders with each factory. 6–16 weeks production depending on brand and customization. We track milestones with every factory. On larger projects, we inspect at the factory before shipment.

6–16 weeks

05

Logistics & customs

Consolidated shipment from our logistics hub in Northern Italy. EU delivery is straightforward; for the US, UK and Middle East we prepare customs documentation and coordinate import clearance. Freight and duties are billed separately at cost, and duties are set by the destination country. Balance due before shipment.

1–4 weeks

06

White-glove delivery

Unpacking, assembly, placement to your floor plan, packaging removal and a walkthrough. If anything is damaged in transit, we handle the claim and replacement — you deal with us, not the factory or shipping company.

On schedule

The timeline

Where the weeks go

Of the 12–20 weeks, the largest block is factory production: 6–16 weeks depending on brand and customization. Boffi kitchens and fully custom Poliform wardrobes sit at the long end (12–18 weeks); lighting from Flos or Artemide is usually fastest at 6–8 weeks. Quotation takes 1–2 weeks up front, shipping and delivery 2–4 weeks at the end.

We map your selections against the site program during step one, so nothing on the critical path is ordered too late — or locked in before it needs to be. It begins with a written brief — here is what one actually looks like.

Full FF&E procurement service →

Start with a specification review

Send your design package and we will come back within one working day with lead-time flags and next steps.